Parent Previous Next

Schedules

Being a multimedia unit, DEVA can perform several actions.

Actions can be scheduled on a time basis per single DEVA and Zone.



Schedule an Action for one DEVA

DEVA that don't belong to a Zone can be programmed independently, i.e. all configured scheduling and events perform actions only on the selected DEVA.

Conversely, on DEVA assigned to a ZONE both scheduling and events can't be programmed on a unit basis, but only for the entire Zone, i.e. for all the DEVA belonging to that Zone.


  1. Select the Schedules Tab in the DEVA control panel and click on Add.



  2. If the DEVA belongs to a Zone an error message is shown and the Add button is not active.



    In this case, set a schedule for the Zone, or move the DEVA out of the Zone.


Schedule an Action for a Zone

  1. Click on the Zone button in the DSM Main menu to access the view of the Zone.
  2. Select the Zone to edit and click on the EDIT button.



  3. Click on the Schedule button.



  4. Click on the Add button